Caunton Engineering are very pleased to have won the order from Benniman Construction for the structural steelwork for a next-generation cold store and logistics hub at the Daventry International Rail Freight Terminal. The 285,000 sq ft cross-docked unit, known as DC11, is in four spans and requires nearly 2000te of steelwork, and will pack in 48 docks, and a 22m haunch height, plus framing for ...