Recent Projects:

Market Sector(s): Mixed Use Development
Caunton Engineering fabricated and supplied the structural steelwork for the 88 Royal Mint Street development in London E1. The project was delivered by IJM Group, with Midgard Ltd acting as the main contractor and structural design by Whitby Wood. This development formed the final phase of a larger 650,000sq.ft scheme delivered by Network Rail and IJM Land.

Caunton supplied more than 1,200 ton...

Market Sector(s): Distribution, Design And Build
Caunton Engineering was appointed by Wilten Construction to deliver the structural steelwork package for a new Manufacturing Facility at Gateway 14, Stowmarket. The project was developed for Turkish-owned sandwich panel manufacturer, Assan Panel.

Caunton’s scope of works included the design, supply, and erection of a twin-span portal frame incorporating integrated crane beams, along with the st...

Market Sector(s): Distribution
Caunton Engineering were very pleased to have been awarded the contract for the structural steelwork package for the new T.J. Morris distribution centre near Doncaster, by main contractor McLaren Construction.

This impressive £108 million facility serves over three hundred Home Bargains stores and features 105 loading bays.

The development comprises a steel-framed warehouse incorporating low...

Market Sector(s): Distribution
Caunton Engineering was appointed by main contractor Bowmer and Kirkland to fabricate, supply and erect the structural steelwork for Indurent Park, Chippenham. The project comprised five new warehouse units within the established 78-acre logistics park, strengthening the region’s provision of high-quality distribution space.

The development includes four twin-span warehouses and...

Market Sector(s): Distribution
Caunton Engineering was appointed by Winvic Construction to design, supply, and erect the main and secondary structural steelwork for a multi-storey car park and a portal framed industrial unit at Indurent Park, Derby (formerly St Modwen Park).

Indurent Park is a 67-acre business park, developed on one of the largest regeneration sites in Derby, delivering modern commercial and industrial facil...

Market Sector(s): Distribution
Caunton Engineering were very pleased to have been awarded the contract by Benniman Group for the structural steelwork for the logistics warehouse development in Cannock.

The site was formerly occupied by a parcel centre which was destroyed by a large fire in 2024.

The design and build project required over 1,200 tonnes of structural steelwork and was constructed to meet BREEAM ‘Very Good’ ...

Our Affiliates

Certificate number 0513

Cyber Essentials Certified Plus NZC Solutions